Close Menu
    Latest Category
    • Finance
    • Tech
    • EU Law
    • Energy
    • About
    • Contact
    EUbusiness.com | EU news, business and politicsEUbusiness.com | EU news, business and politics
    Login
    • EU News
    • Focus
    • Guides
    • Press
    • Jobs
    • Events
    • Directory
    EUbusiness.com | EU news, business and politicsEUbusiness.com | EU news, business and politics
    Home » EU okays Italian compensation for power cuts in Sardinia and Sicily

    EU okays Italian compensation for power cuts in Sardinia and Sicily

    npsnps26 May 2010Updated:25 June 2024
    — Filed under: electricity Energy EU Law - competition EU News Italy State aid
    Share
    Facebook Twitter LinkedIn Pinterest Email

    The European Commission has authorised under EU State aid rules a scheme designed to remunerate companies for the provision of instant interruptibility services (the acceptance of power cuts to avoid black outs) in Italy’s largest islands, Sardinia and Sicily.

    The Commission has concluded that the scheme, which is limited to three years, does not constitute state aid, because it remunerates at market price a service which is necessary to ensure the continuity of electricity supply on these islands.

    “Interruptibility is a valuable service that companies can render to the electricity network to avoid black outs. The Italian scheme will ensure the continuity of electricity supply in Sardinia and Sicily until structural networks problems, due to the particular situation of these islands, can be addressed. The scheme does not involve state aid in view of these specificities and because the remuneration of the service is established by public tender”, said Competition Commissioner Joaquín Almunia.

    Instant interruptibility services consist in companies accepting cuts in their electricity supply without prior notice. It is a service typically provided by companies to the network operator in order to prevent black-outs.

    Already in 2008 the Italian network operator identified certain specific difficulties in ensuring the continuity of electricity supply in Sardinia and Sicily. These difficulties are linked, in particular, to the islands’ insufficient electrical interconnection with the mainland, the presence of large but obsolete power plants which are prone to outages and a high proportion of unpredictable wind-power generation. On the basis of this analysis, the network operator considered it necessary to resort to a higher proportion of interruptible resources than on the mainland for a transitional period of three years, during which the structural problems will be addressed.

    The network operator will therefore tender out 500 MW of interruptible capacity in Sicily and Sardinia. The tender conditions are not restrictive, as the minimum consumption threshold is only 1 MW. According to Italy, a sufficient number of companies is able to meet the tender criteria on both islands. The scheme will last for three years and companies must commit to provide interruptible resources for the whole period.

    The Commission concluded that, since there is a genuine short-term need for more interruptible resources and since the remuneration, which is established by public tender, should in principle reflect the market value of the service provided, the measure does not constitute state aid. This conclusion, which is based on an analysis of the current situation on the islands, is limited to the duration of the scheme (three years).

    The non-confidential version of the decision will be made available under the case number NN 24/2010 in the State Aid Register once any confidentiality issues have been resolved.

    Add A Comment
    Leave A Reply Cancel Reply

    You must be logged in to post a comment.

    nps
    • Website

    Related Content

    Euro coins and notes - Photo by Pixabay

    Eurozone Economic Calendar

    Chemical production nature clouds - Image by andreas N from Pixabay

    Commission to halt Omnibus packages as environmental rules reach “optimal simplicity”

    Sponsor: WWF2 April 2026
    BEAK UAV drone made by Origin Robotics - Photo by Gints Ivuskans © European Union 2025

    Brussels boosts support to Ukrainian deep tech innovators

    Zelensky - Kallas- Ukraine - Photo © European Union 2026

    EU to deliver EUR 1.4 bn revenue from frozen Russian assets to be used for support to Ukraine

    House sparrow - Photo by Alexas Fotos on Pexels

    Brussels issues guidance for ‘more balanced’ rules on protecting wild birds

    Bankruptcy - Image by Michael Schüller from Pixabay

    EU Council greenlights common EU rules for insolvency proceedings

    LATEST EU NEWS
    BEAK UAV drone made by Origin Robotics - Photo by Gints Ivuskans © European Union 2025

    Brussels boosts support to Ukrainian deep tech innovators

    2 April 2026
    Zelensky - Kallas- Ukraine - Photo © European Union 2026

    EU to deliver EUR 1.4 bn revenue from frozen Russian assets to be used for support to Ukraine

    2 April 2026
    House sparrow - Photo by Alexas Fotos on Pexels

    Brussels issues guidance for ‘more balanced’ rules on protecting wild birds

    1 April 2026
    Bankruptcy - Image by Michael Schüller from Pixabay

    EU Council greenlights common EU rules for insolvency proceedings

    30 March 2026
    European-made armoured vehicles - Photo © European Union 2025

    Brussels EUR 1.5 bn work programme to boost European and Ukrainian defence industry

    30 March 2026

    Subscribe to EUbusiness Week

    Get the latest EU news

    CONTACT INFO

    • EUbusiness, 117 High Street, Chesham Buckinghamshire, HP5 1DE, United Kingdom
    • +44(0)20 8058 8232
    • service@eubusiness.com

    INFORMATION

    • About Us
    • Advertising
    • Contact Info

    Services

    • Cookie Policy
    • Terms
    • Disclaimer

    SOCIAL MEDIA

    Facebook
    eubusiness.com © EUbusiness Ltd 2026

    Type above and press Enter to search. Press Esc to cancel.

    Manage Consent
    To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
    Functional Always active
    The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
    Preferences
    The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
    Statistics
    The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
    Marketing
    The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
    • Manage options
    • Manage services
    • Manage {vendor_count} vendors
    • Read more about these purposes
    View preferences
    • {title}
    • {title}
    • {title}

    Sign In or Register

    Welcome Back!

    Login to your account below.

    Lost password?